Skip to content

Add checkout step to release build templates - #13840

Merged
Travis Plunk (TravisEz13) merged 3 commits into
PowerShell:masterfrom
TravisEz13:add-checkout
Oct 23, 2020
Merged

Add checkout step to release build templates#13840
Travis Plunk (TravisEz13) merged 3 commits into
PowerShell:masterfrom
TravisEz13:add-checkout

Conversation

@TravisEz13

@TravisEz13 Travis Plunk (TravisEz13) commented Oct 22, 2020

Copy link
Copy Markdown
Member

PR Summary

Add checkout step to release build templates

PR Context

Prep for using task repo for templates.

PR Checklist

@ghost ghost assigned Ilya (iSazonov) Oct 22, 2020
Comment thread tools/releaseBuild/azureDevOps/releaseBuild.yml Outdated
@TravisEz13
Travis Plunk (TravisEz13) marked this pull request as ready for review October 22, 2020 22:52
@TravisEz13
Travis Plunk (TravisEz13) merged commit 55c2858 into PowerShell:master Oct 23, 2020
@TravisEz13
Travis Plunk (TravisEz13) deleted the add-checkout branch October 23, 2020 18:42
@daxian-dbw Dongbo Wang (daxian-dbw) added the CL-BuildPackaging Indicates that a PR should be marked as a build or packaging change in the Change Log label Nov 16, 2020
@ghost

Copy link
Copy Markdown

🎉v7.2.0-preview.1 has been released which incorporates this pull request.:tada:

Handy links:

Travis Plunk (TravisEz13) added a commit that referenced this pull request Dec 16, 2020
# Conflicts:
#	tools/releaseBuild/azureDevOps/templates/release-GlobalToolTest.yml
#	tools/releaseBuild/azureDevOps/templates/release-SDKTests.yml
#	tools/releaseBuild/azureDevOps/templates/release-UpdateDepsJson.yml
@ghost

Copy link
Copy Markdown

🎉v7.1.1 has been released which incorporates this pull request.:tada:

Handy links:

@ghost

Copy link
Copy Markdown

🎉v7.0.6 has been released which incorporates this pull request.:tada:

Handy links:

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Backport-7.0.x-Done Backport-7.1.x-Done Backport to 7.1.x completed CL-BuildPackaging Indicates that a PR should be marked as a build or packaging change in the Change Log

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants